Wash Floods

The wash is the cathedral’s interior floodlighting: 12 V WS2811 pixel floods (10 W, 1 addressable pixel per fixture, IP65) — the same fixture as the spirelets, run off each tower’s dedicated 12 V flood PSU (HLG-185H-12). Data comes from an SR socket; V+ comes from the fused 12 V flood rail, never through the SR board.

22 fixtures total: 7 per front tower, 4 per back tower (positions from the mount plan, reference/washes.obj — #99, 2026-07-27).

Tower Chain Fixtures SR output Box Universe / channels Pigtail label
Front-right WASH-FR 7, chained 8E (board ID, No. 4) SR 5-8 (E) — low quad corner u55 ch379–399 421 M
Front-left WASH-FL 7, chained 12E (board ID, No. 4) SR 9-12 (E) — low quad corner u61 ch121–141 429 M
Back-left WASH-BL 4, chained 16A (board ID, No. 4) SR 13-16 (A) — spire base u67 ch1–12 411 M
Back-right WASH-BR 4, chained 20A (board ID, No. 4) SR 17-20 (A) — spire base u74 ch1–12 416 M

⚠️ Chain order

Every fixture is identical, so the feed point is the only thing that sets the pixel order — get it wrong and the show’s directional effects land on the wrong faces. Each tower’s floods are chained into ONE string.

Front towers (#99)

The rule: the chain starts at the INNER-FRONT corner — the mount closest to the ROSE WINDOW — then wraps around the OUTSIDE of the tower. The front-left tower runs CLOCKWISE, the front-right tower COUNTER-CLOCKWISE (mirror images).

The inner-front corner carries TWO floods on one stacked bracket — one aimed UP, one aimed DOWN. The UP flood is pixel 1, the DOWN flood pixel 2. Every other flood aims down.

pixel 1 = inner-front UP   →   2 = inner-front DOWN   →   3 = front face
   →   4 = outer face front   →   5 = outer face rear
   →   6 = back face outer    →   7 = back face inner

(outer face = LEFT face on the front-left tower, RIGHT face on the front-right tower.)

Label Where (FR / FL)
421 / 429 SR pigtail → inner-front UP flood data-in
422 / 430 UP out → DOWN in (stacked-pair jumper, same bracket)
423 / 431 DOWN out → front-face in
424 / 432 front out → outer-face front in
425 / 433 outer front out → outer-face rear in
426 / 434 outer rear out → back-face outer in
427 / 435 back outer out → back-face inner in
428 / 436 back-face inner tail — seal (chain end)

Back towers (#102)

Each back tower’s 4 floods mount halfway between the legs (mid-face) on the four faces of the TOP quad arch.

The rule: data feeds the FRONT-face flood first, then runs CLOCKWISE around the tower — matching the quad-arch chain convention (F→L→B→R).

pixel 1 = FRONT   →   pixel 2 = LEFT   →   pixel 3 = BACK   →   pixel 4 = RIGHT
Label Where
411 / 416 SR pigtail → front-face flood data-in
412 / 417 front out → left in (corner jumper)
413 / 418 left out → back in (corner jumper)
414 / 419 back out → right in (corner jumper)
415 / 420 right-face flood tail — seal (chain end)

All junction labels are generated from the wiring DB so the order can’t silently flip — printed on the wash label sheets.

Wiring notes

  • Reversed connector gender: like the spirelets, these fixtures take data in on the FEMALE end — so the SR-side pigtail is MALE (backwards from every other zone). See the bench notes in the project’s flood_wash.md.
  • Color order: RGB (bench-confirmed — unlike the major-arch strips, no swap).
  • Power: one fused tap per chain from the 12 V flood rail — 5 A for a 4-flood back chain (≈ 3.3 A full white), 7.5 A for a 7-flood front chain (≈ 5.8 A full white) — carried on the pigtail V+ with the spirelet-style V+ treatment.
  • Full box wiring: the build sheets for SR 5-8 (E), SR 9-12 (E), SR 13-16 (A) and SR 17-20 (A).

The Gothic Folly — Burning Man 2026